Pass with Construction-Manager Practice Materials 100% for sure

Study and Prepare with CMAA Construction-Manager study material, That's Easy to pass With PracticeMaterial!

Updated: Aug 01, 2026

No. of Questions: 67 Questions & Answers with Testing Engine

Download Limit: Unlimited

Choosing Purchase: "Online Test Engine"
Price: $69.00 

The latest and reliable Construction-Manager Practice Materials with the best key knowledge is for easy pass!

Pass your real exam with PracticeMaterial latest Construction-Manager Practice Materials one-time. All the core knowledge of CMAA Construction-Manager exam practice material are valid and reliable, compiled and edited by the experienced experts team, which can help you to deal the difficulties in the real test and pass the CMAA Construction-Manager exam certainly.

100% Money Back Guarantee

PracticeMaterial has an unprecedented 99.6% first time pass rate among our customers. We're so confident of our products that we provide no hassle product exchange.

  • Best exam practice material
  • Three formats are optional
  • 10 years of excellence
  • 365 Days Free Updates
  • Learn anywhere, anytime
  • 100% Safe shopping experience
  • Instant Download: Our system will send you the products you purchase in mailbox in a minute after payment. (If not received within 12 hours, please contact us. Note: don't forget to check your spam.)

Construction-Manager Online Engine

Construction-Manager Online Test Engine
  • Online Tool, Convenient, easy to study.
  • Instant Online Access
  • Supports All Web Browsers
  • Practice Online Anytime
  • Test History and Performance Review
  • Supports Windows / Mac / Android / iOS, etc.
  • Try Online Engine Demo

Construction-Manager Self Test Engine

Construction-Manager Testing Engine
  • Installable Software Application
  • Simulates Real Exam Environment
  • Builds Construction-Manager Exam Confidence
  • Supports MS Operating System
  • Two Modes For Practice
  • Practice Offline Anytime
  • Software Screenshots

Construction-Manager Practice Q&A's

Construction-Manager PDF
  • Printable Construction-Manager PDF Format
  • Prepared by Construction-Manager Experts
  • Instant Access to Download
  • Study Anywhere, Anytime
  • 365 Days Free Updates
  • Free Construction-Manager PDF Demo Available
  • Download Q&A's Demo

CMAA Construction-Manager Exam Overview:

Certification Vendor:CMAA (Construction Management Association of America)
Exam Name:Certified Construction Manager Examination
Exam Number:CCM
Real Exam Qty:175 (150 scored, 25 unscored pilot items)
Exam Duration:240 minutes
Available Languages:English
Related Certifications:Certified Associate Construction Manager (CACM)
Exam Format:Multiple-choice, Computer-based test (CBT)
Exam Price:$340 (CMAA member) / $440 (non-member) application fee + $290 exam fee
Certificate Validity Period:3 years
Passing Score:67%
Recommended Training:CCM Build Up Course
Professional CM (PCM) Course
Exam Registration:PSI Exam Scheduling
Official Application Portal
Sample Questions:CMAA Construction-Manager Sample Questions
Exam Way:Online remote proctored or in-person at PSI testing centers
Pre Condition:Minimum 48 months of responsible-in-charge construction management experience; relevant bachelor's degree reduces required experience; references and application documentation required
Official Syllabus URL:https://www.cmaanet.org/certification/ccm

CMAA Construction-Manager Exam Syllabus Topics:

SectionWeightObjectives
Professional Practice10%- Leadership and communication
- Professional development
- Ethics and standards
- Legal and regulatory framework
Sustainability5%- Environmental compliance
- Resource efficiency
- Lifecycle assessment
- Green building principles
Contract Administration10%- Negotiation and formation
- Change order management
- Contract types and procurement
- Claims and dispute resolution
Time Management10%- Schedule control
- Critical path method
- Scheduling techniques
- Resource allocation and leveling
Risk Management10%- Monitoring and control
- Identification and assessment
- Mitigation and response planning
- Insurance and liability
Technology5%- BIM and digital tools
- Emerging technologies
- Project management software
- Data management and analytics
Cost Management10%- Financial reporting
- Estimation and budgeting
- Earned value management
- Cost control and forecasting
Safety Management10%- Safety planning and training
- Regulatory compliance
- Hazard identification and control
- Incident investigation
Program & Project Management20%- Project initiation and planning
- Lifecycle management
- Stakeholder management
- Scope management
Quality Management10%- Quality assurance and control
- Continuous improvement
- Compliance and audits
- Planning and standards

CMAA Certified Construction Manager (CCM) Sample Questions:

1. An agency CM is representing the public owner of a large, complex project with numerous site challenges.
The owner has received numerous differing site condition claims on previous projects on this site. The agency CM has reviewed the bid documents and believes the site challenges are clearly and sufficiently detailed for bidders. This is a design-bid-build, lump sum procurement. The apparent low bid is more than 10% lower than the next lowest bid, and the owner is very concerned that the apparent low bidder has not included the cost of mitigating the site challenges in its bid. What should the agency CM do?

A) Conduct a post-bid interview with the apparent low bidder to determine if the bidder has a clear understanding of the site challenges.
B) Conduct a post-bid conference to see if all bidders included the cost of mitigating the site challenges in their bids.
C) Make the recommendation to the owner to reject all bids and re-advertise the project.
D) Ask the designer to verify that the technical specifications describing the site challenges in sufficient detail.


2. An agency CM is overseeing the construction of a large, complex multi-story, high security building in a remote area. The building had a specialized spire installed at the top, which serves as an encrypted signal transmitter. Construction is complete and the contractor has de-mobilized, but then it is discovered that the signal transmitter is not transmitting the signal. The owner's QC plan required testing for the functionality of the transmitter, but the contractor has not shown test results reflecting adequate performance. Who is responsible for the cost of remobilization?

A) Owner
B) Designer of record
C) Contractor
D) Agency CM


3. At what stage of the design phase shall the CM conduct a constructability review?

A) 30% design stage
B) 90% design stage
C) Throughout the design process including 100% design documents
D) 60% design stage


4. Owner's representation staff are managing the construction of a new water treatment plant. The owner has specific operational and sustainability goals they want met and are contracting the team for full commissioning services. The commissioning plan should include which of the following requirements for each party in the commissioning process?

A) Budgeting, sequencing, scheduling, documentation
B) Sequencing, scheduling, startup procedures, verification process
C) Sequencing, scheduling, documentation, verification procedures
D) Sequencing, scheduling, design review, verification procedures


5. The joint between a cast-in-place wall and a cast-in-place roof slab contains a waterstop for a sub-grade structure. While installing roof beams, the waterstop became dislodged from the already-placed wall. A non- conformance report was issued. The engineer of record's repair detail showed to cut and remove the dislodged waterstop sections. The authority/agency re-approved the detail as the waterstop is part of a secondary waterproofing system and the primary system was deemed sufficient. The contractor did not comply with the detail and placed the concrete roof slab over the dislodged material. In this scenario, which of the following options represents the BEST course of action?

A) Based on the engineer of record's recommendation, the contractor should develop a repair detail and submit for approval.
B) The agency should accept as-is and rely on the primary system.
C) All slab concrete should be removed.
D) The concrete should be chopped out, rebar dowels should be drilled into the new slab, and the repair detail should be implemented.


Solutions:

Question # 1
Answer: D
Question # 2
Answer: C
Question # 3
Answer: C
Question # 4
Answer: C
Question # 5
Answer: A

Brilliant pdf files for questions and answers by PracticeMaterial for the CMAA Construction-Manager exam. I recently passed my exam with flying colours. Credit goes to PracticeMaterial. Keep up the good work.

By Miranda

Valid dumps for the Construction-Manager exam by PracticeMaterial. I suggest these to everyone. Quite informative and similar to the real exam. Thank you PracticeMaterial.

By Rachel

PracticeMaterial pdf exam answers for Construction-Manager are very helpful. I prepared using the pdf file and scored 92% marks. Thank you team PracticeMaterial.

By Tina

Practise engine is the best guide to the Construction-Manager certification exam. Helped me score 92% in the exam. Thank you PracticeMaterial.

By Adrian

Excellent question answers pdf for the Construction-Manager certification exam. Prepared me well for the exam. Scored 92% in the first attempt. Highly recommend PracticeMaterial to everyone.

By Bartholomew

I suggest the pdf exam answers by PracticeMaterial for the Construction-Manager exam. Helps a lot in passing the exam with guaranteed good marks. I got 92% marks in the first attempt.

By Carey

Disclaimer Policy: The site does not guarantee the content of the comments. Because of the different time and the changes in the scope of the exam, it can produce different effect. Before you purchase the dump, please carefully read the product introduction from the page. In addition, please be advised the site will not be responsible for the content of the comments and contradictions between users.

PracticeMaterial always adhere to the principle "Customer First" and aims to provide the valid and helpful Construction-Manager exam practice material to help examinees pass exam surely. Featured with the high quality and accurate questions and answers, PracticeMaterial Construction-Manager exam study material can help you pass the real test and get your desired certification as soon as possible.

Besides, we have the money back guarantee on the condition of failure. You just need to show us the failure score report and we will full refund you after confirming.

Frequently Asked Questions

What's the applicable operating system of the Construction-Manager test engine?

Online Test Engine can supports Windows / Mac / Android / iOS, etc., because it is the software based on WEB browser. You can use it on any electronic device and practice with self-paced.
Online Test Engine supports offline practice, while the precondition is that you should run it with the internet at the first time.
Self Test Engine is suitable for windows operating system, running on the Java environment, and can install on multiple computers.
PDF Version: can be read under the Adobe reader, or many other free readers, including OpenOffice, Foxit Reader and Google Docs.

How often do you release your Construction-Manager products updates?

All the products are updated frequently but not on a fixed date. Our professional team pays a great attention to the exam updates and they always upgrade the content accordingly.

What kinds of study material PracticeMaterial provides?

Test Engine: Construction-Manager study test engine can be downloaded and run on your own devices. Practice the test on the interactive & simulated environment.
PDF (duplicate of the test engine): the contents are the same as the test engine, support printing.

How long can I get the Construction-Manager products after purchase?

You will receive an email attached with the Construction-Manager study material within 5-10 minutes, and then you can instantly download it for study. If you do not get the study material after purchase, please contact us with email immediately.

Can I get the updated Construction-Manager study material and how to get?

Yes, you will enjoy one year free update after purchase. If there is any update, our system will automatically send the updated study material to your payment email.

How does your Testing Engine works?

Once download and installed on your PC, you can practice Construction-Manager test questions, review your questions & answers using two different options 'practice exam' and 'virtual exam'.
Virtual Exam - test yourself with exam questions with a time limit.
Practice Exam - review exam questions one by one, see correct answers.

Do you have money back policy? How can I get refund if fail?

Yes. We have the money back guarantee in case of failure by our products. The process of money back is very simple: you just need to show us your failure score report within 60 days from the date of purchase of the exam. We will then verify the authenticity of documents submitted and arrange the refund after receiving the email and confirmation process. The money will be back to your payment account within 7 days.

Do you have any discounts?

We offer some discounts to our customers. There is no limit to some special discount. You can check regularly of our site to get the coupons.

Over 71459+ Satisfied Customers

McAfee Secure sites help keep you safe from identity theft, credit card fraud, spyware, spam, viruses and online scams

Our Clients