Study and Prepare with CMAA Construction-Manager study material, That's Easy to pass With PracticeMaterial!
Updated: Aug 01, 2026
No. of Questions: 67 Questions & Answers with Testing Engine
Download Limit: Unlimited
Pass your real exam with PracticeMaterial latest Construction-Manager Practice Materials one-time. All the core knowledge of CMAA Construction-Manager exam practice material are valid and reliable, compiled and edited by the experienced experts team, which can help you to deal the difficulties in the real test and pass the CMAA Construction-Manager exam certainly.
PracticeMaterial has an unprecedented 99.6% first time pass rate among our customers.
We're so confident of our products that we provide no hassle product exchange.
| Certification Vendor: | CMAA (Construction Management Association of America) |
| Exam Name: | Certified Construction Manager Examination |
| Exam Number: | CCM |
| Real Exam Qty: | 175 (150 scored, 25 unscored pilot items) |
| Exam Duration: | 240 minutes |
| Available Languages: | English |
| Related Certifications: | Certified Associate Construction Manager (CACM) |
| Exam Format: | Multiple-choice, Computer-based test (CBT) |
| Exam Price: | $340 (CMAA member) / $440 (non-member) application fee + $290 exam fee |
| Certificate Validity Period: | 3 years |
| Passing Score: | 67% |
| Recommended Training: | CCM Build Up Course Professional CM (PCM) Course |
| Exam Registration: | PSI Exam Scheduling Official Application Portal |
| Sample Questions: | CMAA Construction-Manager Sample Questions |
| Exam Way: | Online remote proctored or in-person at PSI testing centers |
| Pre Condition: | Minimum 48 months of responsible-in-charge construction management experience; relevant bachelor's degree reduces required experience; references and application documentation required |
| Official Syllabus URL: | https://www.cmaanet.org/certification/ccm |
| Section | Weight | Objectives |
|---|---|---|
| Professional Practice | 10% | - Leadership and communication - Professional development - Ethics and standards - Legal and regulatory framework |
| Sustainability | 5% | - Environmental compliance - Resource efficiency - Lifecycle assessment - Green building principles |
| Contract Administration | 10% | - Negotiation and formation - Change order management - Contract types and procurement - Claims and dispute resolution |
| Time Management | 10% | - Schedule control - Critical path method - Scheduling techniques - Resource allocation and leveling |
| Risk Management | 10% | - Monitoring and control - Identification and assessment - Mitigation and response planning - Insurance and liability |
| Technology | 5% | - BIM and digital tools - Emerging technologies - Project management software - Data management and analytics |
| Cost Management | 10% | - Financial reporting - Estimation and budgeting - Earned value management - Cost control and forecasting |
| Safety Management | 10% | - Safety planning and training - Regulatory compliance - Hazard identification and control - Incident investigation |
| Program & Project Management | 20% | - Project initiation and planning - Lifecycle management - Stakeholder management - Scope management |
| Quality Management | 10% | - Quality assurance and control - Continuous improvement - Compliance and audits - Planning and standards |
1. An agency CM is representing the public owner of a large, complex project with numerous site challenges.
The owner has received numerous differing site condition claims on previous projects on this site. The agency CM has reviewed the bid documents and believes the site challenges are clearly and sufficiently detailed for bidders. This is a design-bid-build, lump sum procurement. The apparent low bid is more than 10% lower than the next lowest bid, and the owner is very concerned that the apparent low bidder has not included the cost of mitigating the site challenges in its bid. What should the agency CM do?
A) Conduct a post-bid interview with the apparent low bidder to determine if the bidder has a clear understanding of the site challenges.
B) Conduct a post-bid conference to see if all bidders included the cost of mitigating the site challenges in their bids.
C) Make the recommendation to the owner to reject all bids and re-advertise the project.
D) Ask the designer to verify that the technical specifications describing the site challenges in sufficient detail.
2. An agency CM is overseeing the construction of a large, complex multi-story, high security building in a remote area. The building had a specialized spire installed at the top, which serves as an encrypted signal transmitter. Construction is complete and the contractor has de-mobilized, but then it is discovered that the signal transmitter is not transmitting the signal. The owner's QC plan required testing for the functionality of the transmitter, but the contractor has not shown test results reflecting adequate performance. Who is responsible for the cost of remobilization?
A) Owner
B) Designer of record
C) Contractor
D) Agency CM
3. At what stage of the design phase shall the CM conduct a constructability review?
A) 30% design stage
B) 90% design stage
C) Throughout the design process including 100% design documents
D) 60% design stage
4. Owner's representation staff are managing the construction of a new water treatment plant. The owner has specific operational and sustainability goals they want met and are contracting the team for full commissioning services. The commissioning plan should include which of the following requirements for each party in the commissioning process?
A) Budgeting, sequencing, scheduling, documentation
B) Sequencing, scheduling, startup procedures, verification process
C) Sequencing, scheduling, documentation, verification procedures
D) Sequencing, scheduling, design review, verification procedures
5. The joint between a cast-in-place wall and a cast-in-place roof slab contains a waterstop for a sub-grade structure. While installing roof beams, the waterstop became dislodged from the already-placed wall. A non- conformance report was issued. The engineer of record's repair detail showed to cut and remove the dislodged waterstop sections. The authority/agency re-approved the detail as the waterstop is part of a secondary waterproofing system and the primary system was deemed sufficient. The contractor did not comply with the detail and placed the concrete roof slab over the dislodged material. In this scenario, which of the following options represents the BEST course of action?
A) Based on the engineer of record's recommendation, the contractor should develop a repair detail and submit for approval.
B) The agency should accept as-is and rely on the primary system.
C) All slab concrete should be removed.
D) The concrete should be chopped out, rebar dowels should be drilled into the new slab, and the repair detail should be implemented.
Solutions:
| Question # 1 Answer: D | Question # 2 Answer: C | Question # 3 Answer: C | Question # 4 Answer: C | Question # 5 Answer: A |
Brilliant pdf files for questions and answers by PracticeMaterial for the CMAA Construction-Manager exam. I recently passed my exam with flying colours. Credit goes to PracticeMaterial. Keep up the good work.
Valid dumps for the Construction-Manager exam by PracticeMaterial. I suggest these to everyone. Quite informative and similar to the real exam. Thank you PracticeMaterial.
PracticeMaterial pdf exam answers for Construction-Manager are very helpful. I prepared using the pdf file and scored 92% marks. Thank you team PracticeMaterial.
Practise engine is the best guide to the Construction-Manager certification exam. Helped me score 92% in the exam. Thank you PracticeMaterial.
Excellent question answers pdf for the Construction-Manager certification exam. Prepared me well for the exam. Scored 92% in the first attempt. Highly recommend PracticeMaterial to everyone.
I suggest the pdf exam answers by PracticeMaterial for the Construction-Manager exam. Helps a lot in passing the exam with guaranteed good marks. I got 92% marks in the first attempt.
Disclaimer Policy: The site does not guarantee the content of the comments. Because of the different time and the changes in the scope of the exam, it can produce different effect. Before you purchase the dump, please carefully read the product introduction from the page. In addition, please be advised the site will not be responsible for the content of the comments and contradictions between users.
PracticeMaterial always adhere to the principle "Customer First" and aims to provide the valid and helpful Construction-Manager exam practice material to help examinees pass exam surely. Featured with the high quality and accurate questions and answers, PracticeMaterial Construction-Manager exam study material can help you pass the real test and get your desired certification as soon as possible.
Besides, we have the money back guarantee on the condition of failure. You just need to show us the failure score report and we will full refund you after confirming.
Online Test Engine can supports Windows / Mac / Android / iOS, etc., because it is the software based on WEB browser. You can use it on any electronic device and practice with self-paced.
Online Test Engine supports offline practice, while the precondition is that you should run it with the internet at the first time.
Self Test Engine is suitable for windows operating system, running on the Java environment, and can install on multiple computers.
PDF Version: can be read under the Adobe reader, or many other free readers, including OpenOffice, Foxit Reader and Google Docs.
All the products are updated frequently but not on a fixed date. Our professional team pays a great attention to the exam updates and they always upgrade the content accordingly.
Test Engine: Construction-Manager study test engine can be downloaded and run on your own devices. Practice the test on the interactive & simulated environment.
PDF (duplicate of the test engine): the contents are the same as the test engine, support printing.
You will receive an email attached with the Construction-Manager study material within 5-10 minutes, and then you can instantly download it for study. If you do not get the study material after purchase, please contact us with email immediately.
Yes, you will enjoy one year free update after purchase. If there is any update, our system will automatically send the updated study material to your payment email.
Once download and installed on your PC, you can practice Construction-Manager test questions, review your questions & answers using two different options 'practice exam' and 'virtual exam'.
Virtual Exam - test yourself with exam questions with a time limit.
Practice Exam - review exam questions one by one, see correct answers.
Yes. We have the money back guarantee in case of failure by our products. The process of money back is very simple: you just need to show us your failure score report within 60 days from the date of purchase of the exam. We will then verify the authenticity of documents submitted and arrange the refund after receiving the email and confirmation process. The money will be back to your payment account within 7 days.
We offer some discounts to our customers. There is no limit to some special discount. You can check regularly of our site to get the coupons.
Over 71459+ Satisfied Customers