[2024] Use Valid Exam E-S4HCON2023 by PracticeMaterial Books For Free Website [Q36-Q61]

Share

[2024] Use Valid Exam E-S4HCON2023 by PracticeMaterial Books For Free Website

Free SAP Certified Technology Specialist E-S4HCON2023 Official Cert Guide PDF Download

NEW QUESTION # 36
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step
"Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:

  • A. The SAP Support Packages found in the download directory
  • B. The SAP Support Packages that will be bound to the upgrade
  • C. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
  • D. The SAP Support Packages contained in the upgrade media

Answer: A


NEW QUESTION # 37
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. Using DMO when applying Support Packages to SAP ECC 6.07
  • B. Upgrading to SAP ECC 6.08 without using DMO
  • C. Updating to SAP ECC 6.07 using DMO
  • D. SAP S/4HANA conversion to SAP S/4HANA 1709

Answer: B,D


NEW QUESTION # 38
Which of the following SUM activities require a stack XML file calculated by the maintenance planner?
Note: There are 3 correct answers to this question.

  • A. Prerequisite check
  • B. SAP S/4HANA conversion including DMO
  • C. SAP S/4HANA conversion without DMO
  • D. Benchmark tool
  • E. DMO without system update

Answer: A,B,C


NEW QUESTION # 39
ICNV initialization does 3

  • A. Build index on flag column
  • B. Creation of flag
  • C. AA
  • D. Creation of views

Answer: A,B,D


NEW QUESTION # 40
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.

  • A. During downtime
  • B. During uptime
  • C. Post-downtime
  • D. During SPDD

Answer: B,C


NEW QUESTION # 41
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
  • B. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
  • C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • D. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps

Answer: A


NEW QUESTION # 42
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:

  • A. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
  • B. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
  • C. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
  • D. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.

Answer: C


NEW QUESTION # 43
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:

  • A. Move the stack.xml update file into the download folder
  • B. Move the R3trans update archive into the download folder
  • C. Extract the SAP HANA database installation archive
  • D. Extract the SAP HANA client installation archive
  • E. Move the SAPM update archive into the download folder

Answer: A,D,E


NEW QUESTION # 44
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?

  • A. The SAP support packages of the support package stack, calculated by the maintenance planner
  • B. The SAP support packages contained in the upgrade media, calculated by the maintenance planner
  • C. The SAP support packages that will be bound to the conversion
  • D. The SAP support packages in the download directory that are newer than the selected support package stack

Answer: D


NEW QUESTION # 45
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Apply the recommendations of the simplification list
  • B. Perform the migration of data into the new data structure
  • C. Run the database migration to the SAP HANA database
  • D. Check the compatibility of custom code with SAP S/4HANA

Answer: A,D


NEW QUESTION # 46
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?

  • A. Downtime conversion
  • B. Silent data migration (SDM)
  • C. Shadow on target creation
  • D. Downtime migration

Answer: D


NEW QUESTION # 47
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:

  • A. Activate the required business functions manually in the production system.
  • B. Specify the business functions that need to be switched on during the prepare part of SUM.
  • C. Import a transport request from the development system that contains the recording of the activation.
  • D. During conversion, SUM delivers some business functions already activated.

Answer: C,D


NEW QUESTION # 48
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. An additional temporary database is used during uptime
  • B. Dedicated application tables are migrated in uptime
  • C. The repository is migrated in uptime
  • D. TABIMJJPG is executed in uptime

Answer: B


NEW QUESTION # 49
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

  • A. The source system is non-Unicode and the target database is a scale-out system.
  • B. Network capacity between exporting and importing R3load processes must be.
  • C. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • D. The target database size increases temporarily because of the Shadow Repository.
  • E. SAP HANA Landscape Reorganization required a manual step to edit a file.

Answer: C,E


NEW QUESTION # 50
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the main configuration option "Single System" in case of an upgrade.
  • B. Using the database migration option (DMO) for SUM
  • C. Using the main configuration option "Single System" when installing an Add-On
  • D. Using the main configuration option "Standard" when applying SAP Support Packages

Answer: C


NEW QUESTION # 51
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In SUM Phaselist
  • B. In DMO Migration Preparation
  • C. In SUM Parameters
  • D. In Process Control Center

Answer: C,D


NEW QUESTION # 52
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.

  • A. Database migration
  • B. Custom code analysis
  • C. Software update
  • D. Unicode conversion

Answer: A,C


NEW QUESTION # 53
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question

  • A. Use DMO for SUM
  • B. Perform an SAP S/4 HANA conversion including DMO
  • C. Upgrade the SAP system
  • D. Apply SAP support packages
  • E. Perform an SAP S/4 HANA conversion without DMO

Answer: A,C,D


NEW QUESTION # 54
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

  • A. After SUM has ended
  • B. During the Execution roadmap step
  • C. Before the start of the SUM technical downtime
  • D. During the SUM technical downtime

Answer: D


NEW QUESTION # 55
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests named <SID>K0<number>
  • B. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • C. By searching for transport requests in the file umodauto.Ist
  • D. By searching for transport requests that are assigned to the project SAP_ADJUST

Answer: C


NEW QUESTION # 56
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?

  • A. Using R3load and network socket connection
  • B. Using work processes and network socket connection
  • C. Using R3load and file transfer
  • D. Using R3load and memory pipes

Answer: D


NEW QUESTION # 57
In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.

  • A. When upgrading an SAP S/4HANA Server system
  • B. When performing an SAP S/4HANA conversion without u DMO
  • C. When performing an SAP S/4HANA conversion with DMO
  • D. When upgrading an SAP ECC system with DMO

Answer: A,D


NEW QUESTION # 58
You are starting an SAP S/4HANA Conversion. The scenario strategy Downtime Optimized Conversion (DoC) is NOT selectable.What could be the reason?

  • A. The SAP S/4HANA Conversion includes a DMO.
  • B. The start release is too old for DOC.
  • C. The source database is not supported
  • D. The SAP S/4HANA Conversion is without DMO.

Answer: C


NEW QUESTION # 59
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.

  • A. DMO can only be run with systems NW740 or NW731
  • B. Target DB size will increase temporarily
  • C. A

Answer: A,B


NEW QUESTION # 60
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:

  • A. Import of dictionary objects from the download directory in phase DDIC_UPG
  • B. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
  • C. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • D. Import of upgrade and language data from the download directory in phase TABIM UPG
  • E. Activation of dictionary objects in phase ACT_UPG

Answer: A,D,E


NEW QUESTION # 61
......

SAP E-S4HCON2023 Official Cert Guide PDF: https://www.practicematerial.com/E-S4HCON2023-exam-materials.html

Exam E-S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade - PracticeMaterial: https://drive.google.com/open?id=1ipGHNCuwxsFl-jFBRczPfMnGSrzUB5cT