
Provide SAP C_IBP_2205 Practice Test Engine for Preparation
Detailed New C_IBP_2205 Exam Questions for Concept Clearance
SAP C_IBP_2205 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Inventory < 8% | Optimize inventory in the supply chain utilizing algorithms that derive inventory targets. |
| S&OP Review < 8% | Describe how IBP extends the logic of S&OP in the network using advanced demand and supply planning integrated with financial plans. |
| Key Figures & Attributes > 12% | Create and use key figures and attributes. |
| User Interface > 12% | Use the Fiori Launchpad to customize the UI, work with Excel UI |
| Supply and Response > 12% | Configure supply planning, run various solvers to generate planning results |
| General Configuration of a Planning Area > 12% | Display, create, copy, edit, check, and activate a planning area. |
SAP C_IBP_2205 Exam Description:
The "SAP Certified Application Associate - SAP IBP for Supply Chain (2205)" certification exam verifies that the candidate possesses the basic knowledge in the area of the SAP supply chain planning. This certificate proves that the candidate has a basic overall understanding within this consultant profile of the industry solutions, and can implement this knowledge practically in projects under guidance of an experienced consultant. It is recommended as an entry-level qualification to allow consultants to get acquainted with the fundamentals of SAP Integrated Business Planning. Please note that this 2205 version of the exam takes part in the Stay Current with SAP Global Certification program. Once you pass this version of the exam, make sure that you start your stay current process. You will be required to take the quarterly stay current assessment for all subsequent SAP IBP releases via the SAP Learning Hub starting with the 2205 release to maintain your SAP IBP consultant certification status and badge. In order to participate in the stay current program and access the stay current enablement and assessment, you will need at minimum an SAP Learning Hub, edition for IoT and Digital Supply Chain subscription. (https://training.sap.com/learninghub)
NEW QUESTION 41
You have set up a planning area and data is available. You adjust the necessary time profile settings and run the consistency check. Which settings can you change and still run a successful consistency check?
Note: There are 2 correct Answers to this question.
- A. Add a new time profile level to the time profile.
- B. Change the past and future horizon of the levels in the time profile.
- C. Change the description of the attributes in the time profile.
- D. Remove an attribute assigned to the time profile level if the attribute is used in a planning level.
Answer: B,C
NEW QUESTION 42
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note:
There are 3 correct answers to this question.
- A. Adjusted transport receipts
- B. Maximum lot size
- C. Minimum lot size
- D. Transportation lead times
- E. Aggregated constraints
Answer: A,B,D
NEW QUESTION 43
Which of the following can be used as inputs for inventory level optimization? Note: There are 2 correct Answers to this question.
- A. Target inventory level
- B. Lead time variability
- C. Lot sizes
- D. Reorder point
Answer: C,D
NEW QUESTION 44
You are configuring disaggregation for the KF1 key figure. Which methods can you apply? Note: There are 3 correct Answers to this question.
- A. Disaggregation in batch triggered by an application job
- B. Disaggregation according to a user-defined expression
- C. Proportional disaggregation by using KF2 in the expression
- D. Disaggregation according to an equal split
- E. An internal system-generated disaggregation
Answer: B,C,D
NEW QUESTION 45
The Analytics Advanced app allows you to work with different types of charts. What can be the origin of the charts you can work with?
- A. Process Templates
- B. Dashboards Advanced
- C. Custom Alerts
- D. SAP IBP VBA Add-in template
Answer: D
NEW QUESTION 46
While modeling for a large machine with high capital needs, you need it to run cost effectively with minimum utilization, even if it means producing more than demand. Which solution would apply to this scenario? Note: There are 2 correct Answers to this question.
- A. Balance can be achieved between excessive prebuild and minimum utilization by incorporating violation costs.
- B. Enough demands can be pulled forward and pull production will occur.
- C. Capacity leveling will be possible for production and storage resources.
- D. Excess stock can be generated and will need to be staged in an overflow warehouse.
Answer: A,B
NEW QUESTION 47
You want to set up demand sensing to analyze demand changes in execution or close to execution windows. Which of the following conditions must you consider during the setup? Note: There are 2 correct Answers to this question.
- A. At setup test the system to run the demand sensing (full) algorithm weekly and the demand sensing (update) on a daily basis.
- B. It is mandatory to load historical lag-based snapshot data.
- C. Set up the forecast model to be executed at product-location level.
- D. The result generates sensed demand data at the monthly time granularity for the full time horizon
Answer: A,B
NEW QUESTION 48
You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.
- A. Set up a three-tier landscape using transport, starting from the development system to test and production.
- B. Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.
- C. Create additional planning areas in the test system to support training needs.
- D. Create additional test planning areas in the production system to support cutover needs.
Answer: A,B
NEW QUESTION 49
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note: There are 2 correct answers to this question.
- A. If necessary source key figures values are disaggregated.
- B. If necessary target key figures values are disaggregated.
- C. Copying multiple key figures on different planning levels is not possible.
- D. Copying multiple key figures can be processed sequentially.
Answer: A,D
NEW QUESTION 50
Which of the following solutions are feasible when using the time series supply optimizer? Note: There are 3 correct Answers to this question.
- A. Violation of minimum resource utilization
- B. Not respecting production capacity
- C. Violation of minimum aggregated inventory values
- D. Not-fully satisfied demands
- E. Not adhering to maximum transport values
Answer: A,C,D
NEW QUESTION 51
Why would you set up a cascading filter in the planning view? Note: There are 2 correct Answers to this question.
- A. To filter attributes based on specific values
- B. To filter using attributes that have a large number of values
- C. To filter data in an Application Job template
- D. To filter attributes based on other attribute filters
Answer: B,D
NEW QUESTION 52
NO.23 You are redesigning planning for supply chain that is facing the issue of variability. What is the best solution for dampening variability via demand classification?
- A. SAP IBP for Demand
- B. SAP IBP for Demand Driven Replenishment
- C. SAP IBP for Sales and Operations Planning
- D. SAP IBP for Inventory
Answer: D
NEW QUESTION 53
You are working to realign the data due to a recent warehouse closure. What should you be aware of in regards to configuration of realignment steps? Note: There are 2 correct Answers to this question.
- A. The name of the realignment step should be no longer than 20 characters.
- B. The number of steps in realignment run is limited to 255.
- C. If a realignment step fails, subsequent steps are not processed.
- D. The realignment step status must be set to In Review for it to be executed.
Answer: C,D
NEW QUESTION 54
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.
- A. Trend Chart Types
- B. Comparison Chart Types
- C. Simulation Chart Types
- D. Geographic Chart Types
- E. Seasonal Chart Types
Answer: A,B,E
NEW QUESTION 55
How many different time levels can be selected within one planning view?
- A. All time levels available in the time profile
- B. Only base time levels of the planning area
- C. Only time levels from the base planning level of selected key figures
- D. All time levels available in the time profile, restricted by global configuration parameter
Answer: A
NEW QUESTION 56
Which functional capabilities are included in SAP IBP for response and supply?Note: There are 2 correct answers to this question.
- A. Analyze Supply Usage
- B. Planning with Product Allocations
- C. Detailed Production Scheduling
- D. Gating Factors
Answer: A,D
NEW QUESTION 57
What setting is mandatory in the Manage Lifecycle Planning app when introducing a new product?
- A. Define at least one attribute of the planning area which represents the Product ID
- B. Define which phase-in and phase-out profiles can be used within Lifecycle Planning
- C. Define which is the attribute ID for the Lifecycle profiles
- D. Define which key figure can be used as sales history for new products
Answer: D
NEW QUESTION 58
You define fixing for a key figure.Which of the following functions are available for this key figure? Note:
There are 2 correct answers to this question.
- A. Fixing is possible for manually editable key figures.
- B. Fixing is possible for a certain quantity of a key figure value.
- C. Fixing is possible for a certain period, including all child values in the hierarchy.
- D. Fixing is possible for system editable key figures.
Answer: C,D
NEW QUESTION 59
When can filter blocks appear in calculations? Note: There are 2 correct Answers to this question.
- A. When modeling attribute transformations
- B. When using IFISNULL statements in the formula
- C. When modeling cross-period calculations
- D. When modeling attribute as a key figure
Answer: A,C
NEW QUESTION 60
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.
- A. Push and Pull production models are used by the optimizer.
- B. Finite heuristics can achieve demand prioritization and pegging.
- C. Prioritization of demand elements one by one is achieved by unconstrained heuristics.
- D. Planning results can be generated faster by the optimizer.
Answer: A,B
NEW QUESTION 61
What are the ways to achieve rolling aggregation with SAP IBP?
- A. Using a local member
- B. Using a key figure calculation
- C. Using a appropriate period weight factor
- D. Using a attribute as a key figure
Answer: C
NEW QUESTION 62
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note: There are 3 correct answers to this question.
- A. The alerts dashboard is not available if a value-based filter is set for the open planning view.
- B. You can only apply one value-based filter per planning view.
- C. These filters can be used together with attribute totals in the same planning view.
- D. These filters are always applied based on the values stored in the database.
- E. You can add (or delete) planning objects to a planning view after these filters are applied.
Answer: A,B,D
NEW QUESTION 63
What are S&OP operator (optimizer) parameters associated with demand fair share?
- A. Number of fair share segments. Maximum inventory. Additional tiering costs (default)
- B. You want to copy a custom planning area that was built during the SAP IBP implementation to model a separate process.
- C. Number of fair share segments. Additional tiering costs (default). Target inventory violation cost
- D. Number of fair share segments. Additional tiering costs (default). Number of fair share segments late delivery
- E. Number of fair share segments. Maximum days of coverage. Number of fair share segments late delivery
Answer: D
NEW QUESTION 64
......
C_IBP_2205 2023 Training With 80 QA's: https://www.practicematerial.com/C_IBP_2205-exam-materials.html

