100% Pass Your C_IBP_2202 Exam Dumps at First Attempt with PracticeMaterial [Q41-Q57]

Share

100% Pass Your C_IBP_2202 Exam Dumps at First Attempt with PracticeMaterial

Penetration testers simulate C_IBP_2202 exam PDF


SAP C_IBP_2202 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Use the Fiori Launchpad to customize the UI, work with Excel UI
  • Key Figures & Attributes
Topic 2
  • Define and view information with user-defined charts and dashboards
  • Supply and Response
Topic 3
  • Describe the benefits of implementing SAP's Integrated Business Planning solution
  • Create and use key figures and attributes
Topic 4
  • Optimize inventory in the supply chain utilizing algorithms that derive inventory targets
  • General Configuration of a Planning Area

 

NEW QUESTION 41
You are reviewing the master data types for supply planning. Which master data types are compound master data types? Note: There are 2 correct Answers to this question.

  • A. SOURCEPRODUCTION
  • B. sourcelocation
  • C. SOURCECUSTOMER
  • D. LOCATIONFR

Answer: B,C

 

NEW QUESTION 42
What are some of the available ABC segmentation methods in IBP? Note: There are 2 correct Answers to this question.

  • A. By Number of Items (Sorted Values)
  • B. By Pareto Principle (Sorted and Cumulated %)
  • C. By Number of Items (Sorted Average)
  • D. By Pareto Principle (Sorted and Calculated Values)

Answer: A,D

 

NEW QUESTION 43
The Analytics Advanced app allows you to work with different types of charts. What can be the origin of the charts you can work with?

  • A. Dashboards Advanced
  • B. SAP IBP VBA Add-in template
  • C. Custom Alerts
  • D. Process Templates

Answer: B

 

NEW QUESTION 44
You create an S&OP operator for heuristics on an SAP IBP project. What must you enable for the S&OP operator that is specifically relevant for subnetworks?

  • A. Compute Expected Supply parameter
  • B. Supply propagation
  • C. Balance Receipts parameter
  • D. Normalize Quotas parameter

Answer: A

 

NEW QUESTION 45
You need to create time periods for the time profile in a planning area. What should you be aware of when executing the Create Time Periods application job?

  • A. The planning area with this time profile must be activated so that the application job can proceed.
  • B. A time profile has to be activated so that the application job can proceed.
  • C. This application job can be run for multiple time profiles at once.
  • D. This application job cannot be scheduled for immediate start.

Answer: A

 

NEW QUESTION 46
How can you check if key figure is editable or non-editable?

  • A. Using the Analytics Advanced app when selecting key figures
  • B. Using the Edit View and then the Edit Planning View option
  • C. Using the Web-based Planning app when selecting key figures
  • D. Using the Key Figure Calculations app

Answer: C

 

NEW QUESTION 47
A time profile is defined with the levels of day, technical week, week, month, quarter, and year.
What condition in configuration will allow you to have a different value in the current week, versus all other buckets?

  • A. IF("PERIODID4" = "SSPERIODID4CU$$...)
  • B. IF("PERIODID5" ="$$PERIODID5CU$$...)
  • C. IF("PERIODID3" ="$$PERIODID3CUSS...)
  • D. IF("PERIODID2" ="$$PERIODID2CU$$...)

Answer: A

 

NEW QUESTION 48
Why would you set up a cascading filter in the planning view? Note: There are 2 correct Answers to this question.

  • A. To filter data in an Application Job template
  • B. To filter attributes based on other attribute filters
  • C. To filter attributes based on specific values
  • D. To filter using attributes that have a large number of values

Answer: B,D

 

NEW QUESTION 49
Which of the following conditions are relevant for subtotals in the planning view? Note: There are 2 correct Answers to this question.

  • A. The total number of attributes that can use subtotals in the planning view can be restricted.
  • B. The total value can be added before or after the selected attribute.
  • C. Only attribute-based totals can be added to the planning view.
  • D. The values of the attribute-based total at the highest attribute level in the planning level can be changed.

Answer: A,B

 

NEW QUESTION 50
Which of the following are functions of SAP IBP for demand? Note: There are 3 correct Answers to this question.

  • A. Detailed statistical analysis of demand data using the supply chain algorithm library
  • B. Demand sensing of demand data using predictive analytics tools
  • C. Embedded, on-the-fly demand analytics
  • D. Demand sensing of demand data using the supply chain algorithm library
  • E. Detailed statistical analysis of demand data using predictive analytics tools

Answer: C,D,E

 

NEW QUESTION 51
Where can we see the results of Time Series analysis in SAP IBP?

  • A. Time Series Property Attribute in Customer
  • B. Time Series Property Attribute in Customer Product
  • C. Time Series Property Attribute in Customer Source
  • D. Time Series Property Attribute in Product

Answer: D

 

NEW QUESTION 52
Which of the following are features of lag-based snapshots? Note: There are 2 correct Answers to this question.

  • A. Lag-based snapshots are automatically assigned to a snapshot operator.
  • B. Target key figures for these snapshots must have lag as a root attribute.
  • C. Target key figures for these snapshots are exposed to the user in planning views.
  • D. Lag-based snapshots are created in the Configuration app for a fixed time range.

Answer: A,B

 

NEW QUESTION 53
Which of the following approaches could you take to reduce run times of an optimizer? Note: There are
2 correct Answers to this question.

  • A. Avoid using telescopic time buckets.
  • B. Increase the use of incremental lot size beyond the frozen horizon.
  • C. Use a subnetwork ID to reduce the size of the problem.
  • D. Split into multiple planning areas to support weekly vs. daily planning needs.

Answer: A,C

 

NEW QUESTION 54
You are working with the inventory optimization process and you want to use a what-if analysis. What parameters are assessed by this analysis?
Note: There are 2 correct Answers to this question.

  • A. Service levels
  • B. Changed variability
  • C. Number of planning combinations
  • D. Capacity consumption

Answer: A,B

 

NEW QUESTION 55
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed? Note: There are 2 correct Answers to this question.

  • A. Push and Pull production models are used by the optimizer.
  • B. Planning results can be generated faster by the optimizer.
  • C. Prioritization of demand elements one by one is achieved by heuristics.
  • D. Finite heuristics can achieve demand prioritization and pegging.

Answer: A,D

 

NEW QUESTION 56
You create a planning filter using an SAP IBP Fiori app. Which of the following objects can it be applied to?
Note: There are 2 correct Answers to this question.

  • A. Planning view templates in the SAP IBP add-in for Microsoft Excel
  • B. Jobs in the Applications Jobs app
  • C. Supply chain graph in Supply Chain Network app
  • D. Snapshot operator in the SAP IBP add-in for Microsoft Excel

Answer: A,B

 

NEW QUESTION 57
......

All C_IBP_2202 Dumps and Training Courses: https://www.practicematerial.com/C_IBP_2202-exam-materials.html