NEW QUESTION 16
Which library is used by the forecasting engine for the demand sensing algorithm?

  • A. Predictive analytics library
  • B. Supply chain algorithm library
  • C. Heuristics library
  • D. Demand library

Answer: B

 

NEW QUESTION 17
You are adding a value-based filter to a planning view. Which of the following conditions apply? Note:
There are 3 correct Answers to this question.

  • A. These filters are always applied based on the values stored in the database.
  • B. You can only apply one value-based filter per planning view.
  • C. The alerts dashboard is not available if a value-based filter is set for the open planning view.
  • D. These filters can be used together with attribute totals in the same planning view.
  • E. You can add (or delete) planning objects to a planning view after these filters are applied.

Answer: A,B,C

 

NEW QUESTION 18
What is a prerequisite for modeling outsourced manufacturers with production capacity?

  • A. Ensure that multiple modes of transportation are set up.
  • B. Use production lead times and offsets to manage components at the outsourced location.
  • C. Model production costs for internal and external production resources to model priority.
  • D. Model target inventory and stocks at the outsourced location.

Answer: C

 

NEW QUESTION 19
Which property of an attribute will allow it to be used as an attribute as a key figure?

  • A. Type NAVCHAR
  • B. Type DECIMAL
  • C. Type TIMESTAMP
  • D. Type INTEGER

Answer: B

 

NEW QUESTION 20
Which of the following solutions are feasible when using the time series supply optimizer? Note: There are 3 correct Answers to this question.

  • A. Violation of minimum resource utilization
  • B. Violation of minimum aggregated inventory values
  • C. Not respecting production capacity
  • D. Not adhering to maximum transport values
  • E. Not-fully satisfied demands

Answer: A,B,E

 

NEW QUESTION 21
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level. Which of the following configuration options are possible for this process?
Note: There are 2 correct Answers to this question.

  • A. Splitting the values from aggregated to detailed level based on time profile attribute
  • B. Splitting the values from aggregated to detailed level based on stored split-factor key figure
  • C. Splitting the values from aggregated to detailed level using multiplication by the proportions
  • D. Splitting the values from detailed to aggregated level by using copy operator

Answer: B,C

 

NEW QUESTION 22
You are configuring disaggregation for the KF1 key figure. Which methods can you apply? Note: There are 3 correct Answers to this question.

  • A. Disaggregation according to an equal split
  • B. Proportional disaggregation by using KF2 in the expression
  • C. An internal system-generated disaggregation
  • D. Disaggregation in batch triggered by an application job
  • E. Disaggregation according to a user-defined expression

Answer: A,B,E

 

NEW QUESTION 23
Time profiles are made out of levels, which are in turn made out of periods. What are the ways SAP IBP identifies profiles and periods?

  • A. Both periods and profiles are identified by an integer.
  • B. Periods are identified by an alphanumeric prefix and profiles by an integer.
  • C. Periods are identified by a start and end date and profiles by an integer.
  • D. Periods are identified by an integer and profiles by an alphanumeric prefix.

Answer: C

 

NEW QUESTION 24
How can you check if key figure is editable or non-editable?

  • A. Using the Analytics Advanced app when selecting key figures
  • B. Using the Edit View and then the Edit Planning View option
  • C. Using the Key Figure Calculations app
  • D. Using the Web-based Planning app when selecting key figures

Answer: D

 

NEW QUESTION 25
Which of the following approaches could you take to reduce run times of an optimizer? Note: There are
2 correct Answers to this question.

  • A. Avoid using telescopic time buckets.
  • B. Use a subnetwork ID to reduce the size of the problem.
  • C. Split into multiple planning areas to support weekly vs. daily planning needs.
  • D. Increase the use of incremental lot size beyond the frozen horizon.

Answer: A,B

 

NEW QUESTION 26
You need to create time periods for the time profile in a planning are
a. What should you be aware of when executing the Create Time Periods application job?

  • A. A time profile has to be activated so that the application job can proceed.
  • B. This application job cannot be scheduled for immediate start.
  • C. The planning area with this time profile must be activated so that the application job can proceed.
  • D. This application job can be run for multiple time profiles at once.

Answer: C

 

NEW QUESTION 27
What differentiates the Create New (Simple copy) and the Create New with Dependencies (Advanced copy) functions of a planning area? Note: There are 2 correct Answers to this question.

  • A. Master data is only shared between the original and the new planning area when you use the Create New (Simple copy) function.
  • B. The planning view favorites are only copied when you use the Advanced copy.
  • C. A copy of the time profile is only created when you use the Create New with Dependencies (Advanced copy) function.
  • D. Associated attributes are only shared between the original and the new planning area when you use the Create New (Simple copy) function.

Answer: A,C

 

NEW QUESTION 28
You created a key figure and want to add calculations. Which of the following rules do you consider?
Note: There are 2 correct Answers to this question.

  • A. Key figures can be calculated across different planning levels.
  • B. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
  • C. The calculation chain for a key figure must always result in a calculated key figure.
  • D. All key figure calculations have calculation inputs, which can be marked as stored or calculated.

Answer: A,D

 

NEW QUESTION 29
What type of key figure requires a planning level to have all attributes as roots?

  • A. The time independent key figure, such as FCSTMAPE
  • B. The conversion key figure, such as exchange rate
  • C. The attribute transformation key figure, such as PERIODID1
  • D. The special key figure marked as an aggregate key figure

Answer: D

 

NEW QUESTION 30
A time profile is defined with the levels of day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other buckets?

  • A. IF("PERIODID5" ="$$PERIODID5CU$$...)
  • B. IF("PERIODID4" ="$$PERIODID4CU$$...)
  • C. IF("PERIODID2" ="$$PERIODID2CU$$...)
  • D. IF("PERIODID3" ="$$PERIODID3CU$$...)

Answer: B

 

NEW QUESTION 31
Which calculations can be processed within the pre-processing step in the forecasting model? Note:
There are 2 correct Answers to this question.

  • A. Rounding can be executed for the sales history.
  • B. Correlations can be evaluated.
  • C. Promotion Sales Lift Ups can be deleted.
  • D. Missing Values can be substituted.

Answer: C,D

 

NEW QUESTION 32
Which of the following are features of the S&OP process templates? Note: There are 2 correct Answers to this question.

  • A. The number of steps in a process template is the same for all implementations.
  • B. New instances of templates allow for re-use of the same processes again.
  • C. Each step depicted in the template can have tasks associated with it.
  • D. All process templates are assigned to dashboards.

Answer: B,C

 

NEW QUESTION 33
When you promote calculated and approved inventory parameters from SAP IBP for inventory, what other IBP modules can be receiving them? Note: There are 2 correct Answers to this question.

  • A. SAP IBP for demand
  • B. SAP IBP for response and supply
  • C. SAP IBP for sales and operations
  • D. DDMRP

Answer: B,C

 

NEW QUESTION 34
You want to set up demand sensing to analyze demand changes in execution or close to execution windows. Which of the following conditions must you consider during the setup? Note: There are 2 correct Answers to this question.

  • A. It is mandatory to load historical lag-based snapshot data.
  • B. Set up the forecast model to be executed at product-location level.
  • C. At setup test the system to run the demand sensing (full) algorithm weekly and the demand sensing (update) on a daily basis.
  • D. The result generates sensed demand data at the monthly time granularity for the full time horizon.

Answer: A,C

 

NEW QUESTION 35
Which of the following is one of the functions of multi-echelon inventory optimization?

  • A. Ability to optimize delivery costs between different locations
  • B. Ability to optimize lead times between different locations
  • C. Ability to maintain high external service levels with low internal service levels
  • D. Ability to maintain high external service levels with high internal service levels

Answer: C

 

NEW QUESTION 36
Which of the following stages can be modeled using scenarios from the S&OP planning cycle? Note:
There are 2 correct Answers to this question.

  • A. Demand-supply balancing
  • B. Demand review
  • C. Demand sensing stage
  • D. Data input review for inventory

Answer: A,B

 

NEW QUESTION 37
You are redesigning planning for supply chain that is facing the issue of variability. What is the best solution for dampening variability via demand classification?

  • A. SAP IBP for Demand
  • B. SAP IBP for Demand Driven Replenishment
  • C. SAP IBP for Inventory
  • D. SAP IBP for Sales and Operations Planning

Answer: B

 

NEW QUESTION 38
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing. Which of the following parameters can you model to plan production with extra shift(s)?

  • A. Adjusted production interactive values
  • B. Production source validity at the start of seasonal peak
  • C. Capacity expansion with additional costs
  • D. Incremental production values

Answer: C

 

NEW QUESTION 39
......

C_IBP_2105 EXAM DUMPS WITH GUARANTEED SUCCESS: https://www.practicematerial.com/C_IBP_2105-exam-materials.html